{"id":300,"date":"2013-10-11T08:23:53","date_gmt":"2013-10-11T08:23:53","guid":{"rendered":"http:\/\/localhost\/leaf\/wordpress\/?page_id=300"},"modified":"2014-01-08T15:13:39","modified_gmt":"2014-01-08T15:13:39","slug":"qa-qc-services","status":"publish","type":"page","link":"http:\/\/energis.com.my\/home\/qa-qc-services\/","title":{"rendered":"QAQC Services"},"content":{"rendered":"<h4><strong><span style=\"color: #ff3c00;\">QAQC for Drilling and Completion<\/span><\/strong><\/h4>\n<ul>\n<li>We develop all necessary QA QC processes, procedures, inspection and test plans and quality plans to meet the needs and requirements of the project<\/li>\n<\/ul>\n<h4><strong><span style=\"color: #ff3c00;\">Auditing practicing based on ISO 9001:2008 or API Q1, 8th edition<\/span><\/strong><\/h4>\n<ul>\n<li>Qualification \/ Vendor Audits \/ Assessment<\/li>\n<li>Customer Audits \/ Assessment<\/li>\n<li>Internal Audits<\/li>\n<\/ul>\n<h4><strong><span style=\"color: #ff3c00;\">Technical Writing Expertise<\/span><\/strong><\/h4>\n<ul>\n<li>Standard Operating Procedure (SOP) &amp; Method of Statement<\/li>\n<li>Specifications, procedures &amp; guidelines proposal write-up<\/li>\n<li>Technical Reports Development<\/li>\n<\/ul>\n<h4><strong><span style=\"color: #ff3c00;\">Quality Engineering Services<\/span><\/strong><\/h4>\n<ul>\n<li>Quality Assurance\/Quality Control Plans<\/li>\n<li>Inspection Test Plans<\/li>\n<li>Failure Investigation<\/li>\n<\/ul>\n<h4><span style=\"color: #ff3c00;\"><strong>Rig Consultant Services<\/strong><\/span><\/h4>\n<ul>\n<li>Oil rig services include technical, manpower, on-site, laboratory, inspection, consulting, measurement, optimization and troubleshooting expertise.<\/li>\n<\/ul>\n<h4><span style=\"color: #ff3c00;\"><strong>Non Compliance Tracking System<\/strong><\/span><\/h4>\n<ul>\n<li>Computerized Accident\/Incident Reporting System (CAIRS), Suspect Counterfeit Items (SCI), or the Daily Occurrence (DO) reports.<\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<p>QAQC for Drilling and Completion We develop all necessary QA QC processes, procedures, inspection and test plans and quality plans to meet the needs and requirements of the project Auditing practicing based on ISO 9001:2008 or API Q1, 8th edition Qualification \/ Vendor Audits \/ Assessment Customer Audits \/ Assessment Internal Audits Technical Writing Expertise [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"http:\/\/energis.com.my\/home\/wp-json\/wp\/v2\/pages\/300"}],"collection":[{"href":"http:\/\/energis.com.my\/home\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/energis.com.my\/home\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/energis.com.my\/home\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/energis.com.my\/home\/wp-json\/wp\/v2\/comments?post=300"}],"version-history":[{"count":39,"href":"http:\/\/energis.com.my\/home\/wp-json\/wp\/v2\/pages\/300\/revisions"}],"predecessor-version":[{"id":1778,"href":"http:\/\/energis.com.my\/home\/wp-json\/wp\/v2\/pages\/300\/revisions\/1778"}],"wp:attachment":[{"href":"http:\/\/energis.com.my\/home\/wp-json\/wp\/v2\/media?parent=300"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}<!-- WP Super Cache is installed but broken. The constant WPCACHEHOME must be set in the file wp-config.php and point at the WP Super Cache plugin directory. -->